Skip to content

10% off BASIX and NatHERS when you send your plans by 30 November.Get your quote

CES Energy, Chapman Environmental Services
Independent energy compliance, Australia-wide

Council-ready certificates, assessed right the first time.

BASIX, NatHERS, Section J and JV3 by accredited, independent assessors. Fixed quotes from your plans, a 48 to 72 hours turnaround, and a 100% council approval record.

No charge, no obligation. 10% off BASIX and NatHERS when you send your plans by 30 November.

Certificate statusCouncil-ready
7.0
star NatHERS
target met
  • 1Plans assessed and modelled
  • 2Commitments mapped to your drawings
  • 3Issued and lodgement-ready
100%
council approval rate
5,000+
projects certified
20+
years in the industry
48 to 72 hours
standard turnaround
Accredited:Design Matters NationalABSANatHERS AccreditedNABERS Accredited
Why CES Energy

The gaps other assessors leave open, we close

We built our service around the three things clients tell us are missing everywhere else: a firm price, proof of quality, and straight answers.

1

Fixed quotes from your plans

We price from your actual drawings, so the figure we quote is the figure you pay. No vague estimates, no extras later.

2

Real sample reports

See exactly what you receive before you order. Download genuine BASIX, NatHERS and Section J samples.

3

Independent and accredited

Accredited through Design Matters National and ABSA, and independent of suppliers, so the advice is impartial.

4

Fast, council-ready

A 48 to 72 hour standard turnaround and a 100% approval record. If a council queries it, we fix it at no cost.

How we price

A fixed price from your plans, not a guess from a table

Two homes that look alike on paper can take very different work. We read your drawings first, then give you one price.

What sets the price

How many dwellings
A single house, a dual occupancy and a granny flat are three different jobs.
Storeys and floor area
More levels and more rooms mean more zones to model.
Windows and glazing
Every window is entered and specified, so a glass-heavy design takes longer.
Construction and services
Wall and floor systems, hot water, solar, pools and rainwater all feed the result.
New build or alteration
Additions and secondary dwellings have their own rules and paperwork.

That is why we price from your drawings rather than a table. The figure we quote is the figure you pay, and larger or multi-dwelling projects usually come in at a lower rate per unit.

Until 30 November

10%off BASIX and NatHERS

Send your plans by 30 November and we take 10% off your fixed quote. Same assessors, same 48 to 72 hours turnaround.

Send your plans

Applies to BASIX certificate and NatHERS assessment quotes requested by 30 November. Commercial work is quoted separately.

What clients say

Trusted by designers, builders and developers

We had a BASIX certificate back the next morning with the commitments mapped straight onto our drawings. It saved us a full revision cycle.
Residential designerSydney (final attribution TBC)
The Section J report was clear enough that our private certifier signed off without a single query. That is rare.
Project builderNewcastle (final attribution TBC)
Their JV3 model gave us the glazing we wanted on the north facade without blowing the energy budget. Genuinely useful advice, not just a tick.
ArchitectWollongong (final attribution TBC)
Australia-wide

Local knowledge, every climate zone

We assess to the correct NatHERS climate zone and state variations for your site. BASIX applies across NSW, while NatHERS, Whole-of-Home, Section J and JV3 apply nationally.

Questions

The things people ask us most

How much does a BASIX certificate cost?

It depends on your plans: the number of dwellings, storeys and floor area, the windows and the construction all change the work involved. Send us your plans and we will reply with a fixed, all-in quote within one business day, at no charge. Multi-dwelling and larger projects are quoted per project, usually at a lower rate per unit.

How fast can I get my certificate?

Standard turnaround is 48 to 72 hours from receiving your plans. If you are up against a lodgement deadline, tell us when you request a quote and we will confirm a priority timeline.

Do you guarantee council approval?

Every certificate we issue is prepared to be council-ready and compliant. We have a 100% approval record, and if a council ever queries one of our reports we resolve it at no extra cost.

Can I see a sample report before I order?

Yes. We publish real sample BASIX, NatHERS and Section J reports so you can see exactly what you receive. Most providers will not show you this. You can download them from our sample reports page.

Which areas do you cover?

We assess and certify Australia-wide. BASIX applies in NSW, while NatHERS, Whole-of-Home, Section J and JV3 apply nationally. We work to the correct climate zone and state variations for your site.

Are you accredited and independent?

Yes. We are accredited through Design Matters National and ABSA, and NABERS accredited for commercial work. We are independent of manufacturers and suppliers, so our advice is impartial.

What do you need from me to start?

Usually just your architectural plans and the site address. For thermal and commercial work a window schedule and construction details speed things up. Upload what you have with your quote request and we will tell you if anything is missing.

What is the difference between BASIX and NatHERS?

BASIX is the NSW sustainability index covering water, energy and thermal comfort for a development application. NatHERS is the national thermal performance star rating. In NSW a BASIX certificate often relies on a NatHERS assessment for the thermal comfort component, which is why we offer them as a bundle.

Ready for a council-ready certificate?

Upload your plans and we will send a fixed quote within one business day. No charge, no obligation.